{"id":19854,"date":"2026-04-29T20:52:39","date_gmt":"2026-04-29T18:52:39","guid":{"rendered":"https:\/\/banulbotosanean.ro\/?p=19854"},"modified":"2026-04-29T20:56:20","modified_gmt":"2026-04-29T18:56:20","slug":"ministerul-transporturilor-a-aprobat-indicatorii-tehnico-economici-pentru-varianta-de-ocolire-flamanzi-investitie-de-100-de-milioane-de-lei","status":"publish","type":"post","link":"https:\/\/banulbotosanean.ro\/index.php\/2026\/04\/29\/ministerul-transporturilor-a-aprobat-indicatorii-tehnico-economici-pentru-varianta-de-ocolire-flamanzi-investitie-de-100-de-milioane-de-lei\/","title":{"rendered":"Ministerul Transporturilor a aprobat indicatorii tehnico-economici pentru Varianta de Ocolire Fl\u0103m\u00e2nzi: Investi\u021bie de 100 de milioane de lei"},"content":{"rendered":"<h1 data-path-to-node=\"2\">Peste 100 de milioane de lei pentru Varianta de Ocolire Fl\u0103m\u00e2nzi: Ordinul de ministru a fost semnat<\/h1>\n<p id=\"p-rc_9b54a6e9ce9ffb4a-50\" data-path-to-node=\"4\"><span data-path-to-node=\"4,0\"><b data-path-to-node=\"4,0\" data-index-in-node=\"0\"><span class=\"citation-122\">O veste de impact major pentru infrastructura \u0219i economia jude\u021bului Boto\u0219ani a venit de la Ministerul Transporturilor.<\/span><\/b><span class=\"citation-122\"> Indicatorii tehnico-economici pentru obiectivul de investi\u021bii \u201eVarianta de ocolire Fl\u0103m\u00e2nzi\u201d au fost aproba\u021bi oficial prin ordin de ministru, deschiz\u00e2nd calea pentru una dintre cele mai necesare lucr\u0103ri de fluidizare a traficului din regiune<\/span><\/span><span data-path-to-node=\"4,2\">.<\/span><\/p>\n<p data-path-to-node=\"4\"><em><strong>\u201eProiectarea este deja licitat\u0103 \u0219i \u00een lucru, termen noiembrie 2026. Acum lucr\u0103m la documentele premerg\u0103toare hot\u0103r\u00e2rii de guvern pentru exproprieri, \u00een paralel cu proiectarea. Mi-am propus ca \u00een martie anul viitor s\u0103 fie lansat\u0103 licita\u021bia pentru execu\u021bia lucr\u0103rilor. Am ales s\u0103 fac mai multe lucruri deodat\u0103 pentru a c\u00e2\u0219tiga timp\u201d<\/strong><\/em>, a declarat<strong> Costel \u0218optic\u0103<\/strong>, administratorul public al Prim\u0103riei ora\u0219ului Fl\u0103m\u00e2nzi.<\/p>\n<h3 data-path-to-node=\"5\">Detaliile financiare ale proiectului<\/h3>\n<p id=\"p-rc_9b54a6e9ce9ffb4a-51\" data-path-to-node=\"6\"><span data-path-to-node=\"6,1\"><span class=\"citation-121\">Conform documentului oficial semnat pe 20 aprilie 2026, valoarea total\u0103 a investi\u021biei se ridic\u0103 la <\/span><b data-path-to-node=\"6,1\" data-index-in-node=\"99\"><span class=\"citation-121\">99.999.000 lei (inclusiv TVA)<\/span><\/b><\/span><span data-path-to-node=\"6,3\">. <\/span><span data-path-to-node=\"6,5\"><span class=\"citation-120\">Din aceast\u0103 sum\u0103, cea mai mare parte este destinat\u0103 lucr\u0103rilor propriu-zise de construc\u021bii \u0219i montaj (C+M), estimate la peste 87,2 milioane de lei<\/span><\/span><span data-path-to-node=\"6,7\">.<\/span><\/p>\n<p data-path-to-node=\"7\">Finan\u021barea acestui proiect strategic va fi asigurat\u0103 din dou\u0103 surse principale:<\/p>\n<p id=\"p-rc_9b54a6e9ce9ffb4a-52\" data-path-to-node=\"8,0,1\"><span data-path-to-node=\"8,0,1,0\"><b data-path-to-node=\"8,0,1,0\" data-index-in-node=\"0\"><span class=\"citation-119\">Fonduri externe nerambursabile<\/span><\/b><span class=\"citation-119\">, prin Programul Transport (P.T.) 2021-2027<\/span><\/span><span data-path-to-node=\"8,0,1,2\">.<\/span><\/p>\n<p id=\"p-rc_9b54a6e9ce9ffb4a-53\" data-path-to-node=\"8,1,1\"><span data-path-to-node=\"8,1,1,0\"><b data-path-to-node=\"8,1,1,0\" data-index-in-node=\"0\"><span class=\"citation-118\">Bugetul de stat<\/span><\/b><span class=\"citation-118\">, prin Ministerul Transporturilor \u0219i Infrastructurii<\/span><\/span><\/p>\n<h3 data-path-to-node=\"9\">Specifica\u021bii tehnice: 7 kilometri de drum nou<\/h3>\n<p id=\"p-rc_9b54a6e9ce9ffb4a-54\" data-path-to-node=\"10\"><span data-path-to-node=\"10,1\"><span class=\"citation-117\">Noua variant\u0103 de ocolire va avea o lungime total\u0103 de <\/span><b data-path-to-node=\"10,1\" data-index-in-node=\"53\"><span class=\"citation-117\">7,28 km<\/span><\/b><span class=\"citation-117\"> \u0219i o l\u0103\u021bime a platformei de 9 metri<\/span><\/span><span data-path-to-node=\"10,3\">. <\/span><span data-path-to-node=\"10,5\"><span class=\"citation-116\">Proiectul este unul complex, incluz\u00e2nd construc\u021bia a <\/span><b data-path-to-node=\"10,5\" data-index-in-node=\"53\"><span class=\"citation-116\">4 structuri de tip poduri, pasaje sau viaducte<\/span><\/b><\/span><span data-path-to-node=\"10,7\">.<\/span><\/p>\n<p id=\"p-rc_9b54a6e9ce9ffb4a-55\" data-path-to-node=\"11\"><span data-path-to-node=\"11,1\"><span class=\"citation-115\">Durata de execu\u021bie a lucr\u0103rilor este prev\u0103zut\u0103 pentru o perioad\u0103 de <\/span><b data-path-to-node=\"11,1\" data-index-in-node=\"68\"><span class=\"citation-115\">24 de luni<\/span><\/b><span class=\"citation-115\"> (2 ani), investi\u021bia fiind e\u0219alonat\u0103 \u00een mod egal pe parcursul celor doi ani de \u0219antier<\/span><\/span><span data-path-to-node=\"11,3\">.<\/span><\/p>\n<h3 data-path-to-node=\"12\">Parteneriat \u00eentre CNAIR \u0219i Prim\u0103ria Fl\u0103m\u00e2nzi<\/h3>\n<p id=\"p-rc_9b54a6e9ce9ffb4a-56\" data-path-to-node=\"13\"><span data-path-to-node=\"13,1\"><span class=\"citation-114\">Beneficiarii direc\u021bi ai proiectului sunt Compania Na\u021bional\u0103 de Administrare a Infrastructurii Rutiere (CNAIR) \u0219i Prim\u0103ria Ora\u0219ului Fl\u0103m\u00e2nzi<\/span><\/span><span data-path-to-node=\"13,3\">. Aceast\u0103 colaborare este esen\u021bial\u0103 pentru scoaterea traficului greu din interiorul localit\u0103\u021bii, ceea ce va duce nu doar la o siguran\u021b\u0103 rutier\u0103 sporit\u0103, ci \u0219i la noi oportunit\u0103\u021bi de dezvoltare economic\u0103 de-a lungul noului tronson de drum.<\/span><\/p>\n<p id=\"p-rc_9b54a6e9ce9ffb4a-57\" data-path-to-node=\"14\"><span data-path-to-node=\"14,1\"><span class=\"citation-113\">Proiectul a primit deja avizele necesare de la Consiliul Tehnico-Economic al ministerului<\/span><\/span><span data-path-to-node=\"14,3\">.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Peste 100 de milioane de lei pentru Varianta de Ocolire Fl\u0103m\u00e2nzi: Ordinul de ministru a fost semnat O veste de impact major pentru infrastructura \u0219i economia jude\u021bului Boto\u0219ani a venit de la Ministerul Transporturilor. Indicatorii tehnico-economici pentru obiectivul de investi\u021bii \u201eVarianta de ocolire Fl\u0103m\u00e2nzi\u201d au fost aproba\u021bi oficial prin ordin de ministru, deschiz\u00e2nd calea pentru<\/p>\n","protected":false},"author":1,"featured_media":19071,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,7,4],"tags":[9378,10123,10124,10122,3760,4458,6179,10121],"class_list":{"0":"post-19854","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-administratie","8":"category-economic","9":"category-stiri-botosani","10":"tag-centura-flamanzi","11":"tag-cnair-botosani","12":"tag-drum-ocolitor-flamanzi","13":"tag-finantare-programul-transport","14":"tag-infrastructura-rutiera-botosani","15":"tag-investitii-botosani","16":"tag-ministerul-transporturilor","17":"tag-varianta-de-ocolire-flamanzi"},"_links":{"self":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts\/19854","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/comments?post=19854"}],"version-history":[{"count":4,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts\/19854\/revisions"}],"predecessor-version":[{"id":19858,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts\/19854\/revisions\/19858"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/media\/19071"}],"wp:attachment":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/media?parent=19854"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/categories?post=19854"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/tags?post=19854"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}