{"id":19386,"date":"2026-04-09T08:08:46","date_gmt":"2026-04-09T06:08:46","guid":{"rendered":"https:\/\/banulbotosanean.ro\/?p=19386"},"modified":"2026-04-09T08:08:46","modified_gmt":"2026-04-09T06:08:46","slug":"gigantul-danez-eurowind-energy-vrea-sa-construiasca-in-botosani-cel-mai-mare-parc-eolian-onshore-din-europa-proiectul-de-12-gw-inca-in-faza-de-verificari","status":"publish","type":"post","link":"https:\/\/banulbotosanean.ro\/index.php\/2026\/04\/09\/gigantul-danez-eurowind-energy-vrea-sa-construiasca-in-botosani-cel-mai-mare-parc-eolian-onshore-din-europa-proiectul-de-12-gw-inca-in-faza-de-verificari\/","title":{"rendered":"Gigantul danez Eurowind Energy vrea s\u0103 construiasc\u0103 \u00een Boto\u0219ani cel mai mare parc eolian onshore din Europa. Proiectul de 1,2 GW, \u00eenc\u0103 \u00een faza de verific\u0103ri"},"content":{"rendered":"<h1>Energia v\u00e2ntului \u00een nordul Moldovei: CEO-ul Eurowind Energy detaliaz\u0103 mega-proiectul de la Boto\u0219ani<\/h1>\n<p class=\"ds-markdown-paragraph\"><strong>Jens Rasmussen, CEO-ul dezvoltatorului cu 7,5 GW \u00een pipeline \u00een Rom\u00e2nia, dezv\u0103luie stadiul uria\u0219ei investi\u021bii din nordul Moldovei: &#8222;ATR-ul nu a fost primit integral&#8221;<\/strong><\/p>\n<p class=\"ds-markdown-paragraph\"><strong>\u00centr-un interviu acordat publica\u021biei <a href=\"https:\/\/economica.net\/\" target=\"_blank\" rel=\"noopener noreferrer\">Economica.net<\/a>\u00a0pe 7 aprilie 2026, Jens Rasmussen, CEO-ul companiei daneze Eurowind Energy, a oferit primele detalii concrete despre un proiect de o amploare f\u0103r\u0103 precedent pentru Rom\u00e2nia: un parc eolian de aproximativ 1,2 GW \u00een jude\u021bul Boto\u0219ani, care ar putea deveni cel mai mare proiect eolian onshore din Europa.<\/strong><\/p>\n<p class=\"ds-markdown-paragraph\">De\u0219i danezii au deja o prezen\u021b\u0103 consolidat\u0103 \u00een Rom\u00e2nia, cu patru parcuri solare opera\u021bionale \u0219i un pipeline total de circa 7,5 GW, toate privirile sunt acum \u00eendreptate spre Moldova. Iar Boto\u0219aniul este \u00een centrul aten\u021biei.<\/p>\n<h2>Un proiect care ar putea rescrie harta energiei verzi din Europa<\/h2>\n<p class=\"ds-markdown-paragraph\">\u00centrebat despre planurile din nordul \u021b\u0103rii, Jens Rasmussen a confirmat amploarea ambi\u021biilor companiei:<\/p>\n<blockquote>\n<p class=\"ds-markdown-paragraph\"><strong>&#8222;\u00cencerc\u0103m s\u0103 ne diversific\u0103m portofoliul din punct de vedere geografic, astfel \u00eenc\u00e2t s\u0103 putem furniza energie \u00een mai multe zone ale \u021b\u0103rii. Credem c\u0103 \u00een acea regiune va exista \u0219i o cerere important\u0103 de energie. \u00cen plus, este o zon\u0103 potrivit\u0103 pentru un proiect de foarte mare anvergur\u0103, care ar putea deveni cel mai mare proiect eolian onshore din Europa.&#8221;<\/strong><\/p>\n<\/blockquote>\n<p class=\"ds-markdown-paragraph\">Declara\u021bia vine la scurt timp dup\u0103 ce Eurowind Energy a anun\u021bat finalizarea unui PPA corporate pe 12 ani cu o companie elve\u021bian\u0103 cu activitate \u00een Rom\u00e2nia, semn c\u0103 juc\u0103torii priva\u021bi \u00eencep s\u0103 \u00ee\u0219i asigure pe termen lung energia din surse regenerabile.<\/p>\n<h2>Stadiul actual: ATR-ul, \u00eenc\u0103 pe lista de a\u0219teptare<\/h2>\n<p class=\"ds-markdown-paragraph\">De\u0219i proiectul este \u00een portofoliu de ceva timp, autoriza\u021biile nu au fost \u00eenc\u0103 ob\u021binute integral. La \u00eentrebarea jurnalistului despre avansul cu autoriza\u021biile \u0219i securizarea terenului, CEO-ul danez a fost direct:<\/p>\n<blockquote>\n<p class=\"ds-markdown-paragraph\"><strong>&#8222;Suntem \u00eenc\u0103 \u00eentr-o etap\u0103 \u00een care unele elemente trebuie verificate \u00een detaliu. Din c\u00e2te \u0219tiu, ATR-ul nu a fost primit integral.&#8221;<\/strong><\/p>\n<\/blockquote>\n<p class=\"ds-markdown-paragraph\">ATR-ul (Avizul Tehnic de Racordare) este documentul esen\u021bial emis de operatorul de re\u021bea care stabile\u0219te condi\u021biile \u00een care un proiect poate fi conectat la sistemul energetic na\u021bional. F\u0103r\u0103 acesta, niciun dezvoltator nu poate \u00eencepe construc\u021bia. Iar \u00een cazul unui proiect de 1,2 GW, amploarea lucr\u0103rilor de racordare este ea \u00eens\u0103\u0219i o provocare major\u0103.<\/p>\n<h2>Avantajul Boto\u0219aniului: o zon\u0103 mai pu\u021bin aglomerat\u0103<\/h2>\n<p class=\"ds-markdown-paragraph\">\u00centrebat dac\u0103 \u00een nordul Moldovei este mai u\u0219or de construit sau racordat, av\u00e2nd \u00een vedere c\u0103 re\u021beaua nu este la fel de suprasaturat\u0103 ca \u00een sud sau est, Rasmussen a oferit o perspectiv\u0103 realist\u0103:<\/p>\n<blockquote>\n<p class=\"ds-markdown-paragraph\"><strong>&#8222;Nu cred c\u0103 este neap\u0103rat mai u\u0219or de construit, \u00eens\u0103 \u00eentr-o zon\u0103 mai pu\u021bin aglomerat\u0103 din punctul de vedere al proiectelor eoliene poate fi mai u\u0219or s\u0103 negociezi racordarea.&#8221;<\/strong><\/p>\n<\/blockquote>\n<p class=\"ds-markdown-paragraph\">Aceasta este o recunoa\u0219tere indirect\u0103 a faptului c\u0103 zonele precum Dobrogea sau B\u0103r\u0103ganul sunt deja \u201eblocate\u201d de zeci de proiecte care se bat pe aceea\u0219i capacitate de re\u021bea. Boto\u0219aniul, mai pu\u021bin explorat p\u00e2n\u0103 acum de dezvoltatorii eolieni, devine astfel o \u201efrontier\u0103 verde\u201d cu poten\u021bial uria\u0219.<\/p>\n<h2>Ce \u00eenseamn\u0103 1,2 GW pentru Boto\u0219ani \u0219i pentru Rom\u00e2nia<\/h2>\n<p class=\"ds-markdown-paragraph\">Pentru a \u00een\u021belege magnitudinea:<\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\">Un singur parc eolian de 1,2 GW ar dep\u0103\u0219i capacitatea combinat\u0103 a multor parcuri existente \u00een Rom\u00e2nia.<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">Pentru compara\u021bie, cel mai mare parc eolian onshore din Europa \u00een acest moment este parcul \u201eF\u00e2nt\u00e2nele-Cogealac\u201d (600 MW). Proiectul Eurowind Energy l-ar dubla.<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">O astfel de investi\u021bie ar atrage sute de milioane de euro, ar crea mii de locuri de munc\u0103 \u00een perioada de construc\u021bie \u0219i ar genera venituri substan\u021biale la bugetul local prin taxe \u0219i impozite.<\/p>\n<\/li>\n<\/ul>\n<p class=\"ds-markdown-paragraph\">Pe de alt\u0103 parte, r\u0103m\u00e2n \u00eentreb\u0103ri legate de re\u021beaua de transport din zon\u0103, despre care speciali\u0219tii \u0219tiu c\u0103 este insuficient dezvoltat\u0103. Transelectrica va trebui s\u0103 investeasc\u0103 masiv \u00een noi sta\u021bii \u0219i linii pentru a putea prelua o asemenea putere. Prima investi\u021bie va fi linia de 400 KV Suceava-B\u0103l\u021bi, iar apoi este proiectul sta\u021biei de injectare a energiei electrice pentru care tot insist\u0103 Valeriu Iftime, pre\u0219edintele Consiliului Jude\u021bean Boto\u0219ani.<\/p>\n<p class=\"ds-markdown-paragraph\">\u00cen acela\u0219i interviu, Jens Rasmussen a criticat dur lipsa de asumare a operatorilor de re\u021bea \u0219i birocra\u021bia excesiv\u0103 care duce la \u00eent\u00e2rzieri de ani de zile. De\u0219i nu a f\u0103cut referire direct la proiectul Boto\u0219ani, tonul general a fost unul de frustrare:<\/p>\n<blockquote>\n<p class=\"ds-markdown-paragraph\"><strong>&#8222;Pentru noi, pentru investitori, exist\u0103 \u00eens\u0103 consecin\u021be majore. Dac\u0103 ai un proiect de aproximativ 100 de milioane de euro \u0219i acesta st\u0103 un an pe loc, costul este uria\u0219 pentru companie \u0219i absurd pentru \u021bar\u0103.&#8221;<\/strong><\/p>\n<\/blockquote>\n<p class=\"ds-markdown-paragraph\">R\u0103m\u00e2ne de v\u0103zut dac\u0103 proiectul din Boto\u0219ani va urma acela\u0219i calvar birocratic sau dac\u0103 autorit\u0103\u021bile rom\u00e2ne vor \u00een\u021belege oportunitatea istoric\u0103 pe care o reprezint\u0103.<\/p>\n<p class=\"ds-markdown-paragraph\">P\u00e2n\u0103 atunci, declara\u021bia lui Rasmussen r\u0103m\u00e2ne ca un semnal clar: Boto\u0219aniul este pe harta marilor investi\u021bii \u00een energie regenerabil\u0103, iar deciziile care se iau acum la Bucure\u0219ti \u0219i la Transelectrica vor decide dac\u0103 acest proiect devine realitate sau r\u0103m\u00e2ne doar o promisiune.<\/p>\n<p class=\"ds-markdown-paragraph\"><strong>Sursa:<\/strong>\u00a0<a href=\"https:\/\/economica.net\/\" target=\"_blank\" rel=\"noopener noreferrer\">Economica.net<\/a>,\u00a0interviu publicat pe 7 aprilie 2026, autor Mihai Nicu\u021b.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Energia v\u00e2ntului \u00een nordul Moldovei: CEO-ul Eurowind Energy detaliaz\u0103 mega-proiectul de la Boto\u0219ani Jens Rasmussen, CEO-ul dezvoltatorului cu 7,5 GW \u00een pipeline \u00een Rom\u00e2nia, dezv\u0103luie stadiul uria\u0219ei investi\u021bii din nordul Moldovei: &#8222;ATR-ul nu a fost primit integral&#8221; \u00centr-un interviu acordat publica\u021biei Economica.net\u00a0pe 7 aprilie 2026, Jens Rasmussen, CEO-ul companiei daneze Eurowind Energy, a oferit primele<\/p>\n","protected":false},"author":1,"featured_media":6283,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7,4],"tags":[9802,9804,6161,9800,9803,9801,9805],"class_list":["post-19386","post","type-post","status-publish","format-standard","has-post-thumbnail","category-economic","category-stiri-botosani","tag-cel-mai-mare-parc-eolian-europa","tag-economica-net-interviu","tag-energie-eoliana-botosani","tag-eurowind-energy-botosani","tag-investitii-regenerabile-romania","tag-jens-rasmussen-interviu","tag-parc-eolian-1-2-gw"],"_links":{"self":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts\/19386","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/comments?post=19386"}],"version-history":[{"count":2,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts\/19386\/revisions"}],"predecessor-version":[{"id":19388,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts\/19386\/revisions\/19388"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/media\/6283"}],"wp:attachment":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/media?parent=19386"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/categories?post=19386"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/tags?post=19386"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}