{"id":14517,"date":"2025-06-28T10:26:46","date_gmt":"2025-06-28T08:26:46","guid":{"rendered":"https:\/\/banulbotosanean.ro\/?p=14517"},"modified":"2025-06-28T10:26:46","modified_gmt":"2025-06-28T08:26:46","slug":"loturile-2-si-3-din-drumul-vamii-intra-in-modernizare-38-km-de-infrastructura-noua-in-nordul-judetului-botosani","status":"publish","type":"post","link":"https:\/\/banulbotosanean.ro\/index.php\/2025\/06\/28\/loturile-2-si-3-din-drumul-vamii-intra-in-modernizare-38-km-de-infrastructura-noua-in-nordul-judetului-botosani\/","title":{"rendered":"Loturile 2 \u0219i 3 din Drumul V\u0103mii intr\u0103 \u00een modernizare: 38 km de infrastructur\u0103 nou\u0103 \u00een nordul jude\u021bului Boto\u0219ani"},"content":{"rendered":"<p data-start=\"0\" data-end=\"139\"><strong data-start=\"0\" data-end=\"139\">Drumul V\u0103mii intr\u0103 \u00een modernizare: dou\u0103 tronsoane, peste 38 km reabilita\u021bi. Investi\u021bie strategic\u0103 pentru dezvoltarea jude\u021bului Boto\u0219ani<\/strong><\/p>\n<p data-start=\"141\" data-end=\"544\"><em data-start=\"141\" data-end=\"166\">Boto\u0219ani, 28 iunie 2025<\/em> \u2013 Consiliul Jude\u021bean Boto\u0219ani a f\u0103cut un pas decisiv \u00een direc\u021bia moderniz\u0103rii infrastructurii rutiere, prin semnarea contractelor de execu\u021bie lucr\u0103ri pentru <strong data-start=\"324\" data-end=\"356\">dou\u0103 dintre cele trei loturi<\/strong> ale proiectului de reabilitare a <strong data-start=\"390\" data-end=\"417\">Drumului V\u0103mii \u2013 DJ 282<\/strong>, un obiectiv strategic ce traverseaz\u0103 comunele <strong data-start=\"465\" data-end=\"516\">H\u0103ne\u0219ti, Vl\u0103sine\u0219ti, S\u0103veni, Dr\u0103gu\u0219eni, Co\u021bu\u0219ca<\/strong> \u0219i ora\u0219ul <strong data-start=\"527\" data-end=\"543\">R\u0103d\u0103u\u021bi Prut<\/strong>.<\/p>\n<blockquote data-start=\"546\" data-end=\"754\">\n<p data-start=\"548\" data-end=\"754\">\u201e<strong data-start=\"549\" data-end=\"676\">\u00cenc\u0103 o etap\u0103 extrem de important\u0103 a fost parcurs\u0103 \u00een procesul de implementare a proiectului de modernizare a Drumului V\u0103mii<\/strong>\u201d, a declarat <strong data-start=\"690\" data-end=\"705\">Dorin Birta<\/strong>, vicepre\u0219edintele Consiliului Jude\u021bean Boto\u0219ani.<\/p>\n<\/blockquote>\n<h3 data-start=\"761\" data-end=\"834\">\u00a0Cele dou\u0103 loturi semnate: peste 38 de kilometri de drum modernizat<\/h3>\n<p data-start=\"836\" data-end=\"1099\">Contractele au fost semnate pentru <strong data-start=\"871\" data-end=\"890\">Loturile 2 \u0219i 3<\/strong>, \u00eensum\u00e2nd <strong data-start=\"901\" data-end=\"921\">38,223 kilometri<\/strong> din totalul de <strong data-start=\"937\" data-end=\"950\">48,799 km<\/strong> prev\u0103zu\u021bi \u00een proiect. Lucr\u0103rile vor fi realizate de <strong data-start=\"1003\" data-end=\"1072\">Asocierea SC BIG CONF SRL (Lider) &amp; SC CONSTRUCT COM SRL Boto\u0219ani<\/strong>, c\u00e2\u0219tig\u0103toarea licita\u021biei.<\/p>\n<h4 data-start=\"1101\" data-end=\"1145\">\u2705 Lotul 2: S\u0103veni \u2013 Co\u021bu\u0219ca (22,771 km)<\/h4>\n<p data-start=\"1146\" data-end=\"1179\">Tronsonul asigur\u0103 leg\u0103tura \u00eentre:<\/p>\n<ul data-start=\"1180\" data-end=\"1320\">\n<li data-start=\"1180\" data-end=\"1320\">\n<p data-start=\"1182\" data-end=\"1320\"><strong data-start=\"1182\" data-end=\"1212\">S\u0103veni (intersec\u021bie DN 29)<\/strong> \u2013 <strong data-start=\"1215\" data-end=\"1226\">Podriga<\/strong> \u2013 <strong data-start=\"1229\" data-end=\"1242\">Dr\u0103gu\u0219eni<\/strong> \u2013 <strong data-start=\"1245\" data-end=\"1268\">Mihail Kog\u0103lniceanu<\/strong> \u2013 <strong data-start=\"1271\" data-end=\"1284\">Nichiteni<\/strong> \u2013 <strong data-start=\"1287\" data-end=\"1319\">Co\u021bu\u0219ca (intersec\u021bie DJ 293)<\/strong>.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1322\" data-end=\"1339\">Lucr\u0103rile includ:<\/p>\n<ul data-start=\"1340\" data-end=\"1535\">\n<li data-start=\"1340\" data-end=\"1380\">\n<p data-start=\"1342\" data-end=\"1380\">modernizarea drumului \u0219i a 3 poduri,<\/p>\n<\/li>\n<li data-start=\"1381\" data-end=\"1414\">\n<p data-start=\"1383\" data-end=\"1414\">consolid\u0103ri pe dou\u0103 sectoare,<\/p>\n<\/li>\n<li data-start=\"1415\" data-end=\"1439\">\n<p data-start=\"1417\" data-end=\"1439\">canalizare pluvial\u0103,<\/p>\n<\/li>\n<li data-start=\"1440\" data-end=\"1478\">\n<p data-start=\"1442\" data-end=\"1478\"><strong data-start=\"1442\" data-end=\"1475\">instala\u021bii de iluminat public<\/strong>,<\/p>\n<\/li>\n<li data-start=\"1479\" data-end=\"1535\">\n<p data-start=\"1481\" data-end=\"1535\"><strong data-start=\"1481\" data-end=\"1509\">sta\u021bie de \u00eenc\u0103rcare auto<\/strong> \u0219i <strong data-start=\"1513\" data-end=\"1534\">sta\u021bie de pompare<\/strong>.<\/p>\n<\/li>\n<\/ul>\n<h4 data-start=\"1537\" data-end=\"1587\">\u2705 Lotul 3: Co\u021bu\u0219ca \u2013 R\u0103d\u0103u\u021bi Prut (15,452 km)<\/h4>\n<p data-start=\"1588\" data-end=\"1630\">Tronsonul III va asigura conexiunea \u00eentre:<\/p>\n<ul data-start=\"1631\" data-end=\"1718\">\n<li data-start=\"1631\" data-end=\"1718\">\n<p data-start=\"1633\" data-end=\"1718\"><strong data-start=\"1633\" data-end=\"1665\">Co\u021bu\u0219ca (intersec\u021bie DJ 293)<\/strong> \u2013 <strong data-start=\"1668\" data-end=\"1684\">R\u0103d\u0103u\u021bi Prut<\/strong>, la grani\u021ba cu Republica Moldova.<\/p>\n<\/li>\n<\/ul>\n<h3 data-start=\"1725\" data-end=\"1768\">O investi\u021bie cu impact transna\u021bional<\/h3>\n<blockquote data-start=\"1770\" data-end=\"2073\">\n<p data-start=\"1772\" data-end=\"2073\">\u201e<strong data-start=\"1773\" data-end=\"2048\">Modernizarea drumului jude\u021bean DJ 282 &#8211; Drumul V\u0103mii este un proiect major, ce va asigura conectivitate direct\u0103 la Vama transna\u021bional\u0103 R\u0103d\u0103u\u021bi-Prut cu Republica Moldova \u0219i va contribui din plin la dezvoltarea jude\u021bului, el fiind o continuare fireasc\u0103 a Drumului Strategic<\/strong>\u201d, a punctat Dorin Birta.<\/p>\n<\/blockquote>\n<p data-start=\"2075\" data-end=\"2253\">Proiectul este <strong data-start=\"2090\" data-end=\"2145\">finan\u021bat prin Programul Regional Nord-Est 2021\u20132027<\/strong>, iar lucr\u0103rile vor avea un impact direct asupra conectivit\u0103\u021bii \u0219i dezvolt\u0103rii economice \u00een zona de grani\u021b\u0103.<\/p>\n<hr data-start=\"2255\" data-end=\"2258\" \/>\n<h3 data-start=\"2260\" data-end=\"2304\">\ud83d\udd27 Infrastructur\u0103 modern\u0103 \u0219i sustenabil\u0103<\/h3>\n<p data-start=\"2306\" data-end=\"2364\">Printre componentele importante ale proiectului se num\u0103r\u0103:<\/p>\n<ul data-start=\"2365\" data-end=\"2672\">\n<li data-start=\"2365\" data-end=\"2411\">\n<p data-start=\"2367\" data-end=\"2411\"><strong data-start=\"2367\" data-end=\"2408\">5 poduri \u0219i 80 de pode\u021be transversale<\/strong>,<\/p>\n<\/li>\n<li data-start=\"2412\" data-end=\"2455\">\n<p data-start=\"2414\" data-end=\"2455\"><strong data-start=\"2414\" data-end=\"2452\">26 de parc\u0103ri \u0219i sta\u021bii de autobuz<\/strong>,<\/p>\n<\/li>\n<li data-start=\"2456\" data-end=\"2492\">\n<p data-start=\"2458\" data-end=\"2492\"><strong data-start=\"2458\" data-end=\"2489\">16 km de piste de biciclete<\/strong>,<\/p>\n<\/li>\n<li data-start=\"2493\" data-end=\"2592\">\n<p data-start=\"2495\" data-end=\"2592\"><strong data-start=\"2495\" data-end=\"2532\">4 sta\u021bii de re\u00eenc\u0103rcare electric\u0103<\/strong> \u00een localit\u0103\u021bile H\u0103ne\u0219ti, S\u0103veni, Co\u021bu\u0219ca \u0219i R\u0103d\u0103u\u021bi-Prut,<\/p>\n<\/li>\n<li data-start=\"2593\" data-end=\"2672\">\n<p data-start=\"2595\" data-end=\"2672\"><strong data-start=\"2595\" data-end=\"2634\">consolid\u0103ri \u0219i stabiliz\u0103ri de teren<\/strong> pe o lungime total\u0103 de 1,8 kilometri.<\/p>\n<\/li>\n<\/ul>\n<blockquote data-start=\"2674\" data-end=\"2866\">\n<p data-start=\"2676\" data-end=\"2866\">\u201e<strong data-start=\"2677\" data-end=\"2835\">Este, de asemenea, rezultatul muncii \u0219i eforturilor comune ale multor oameni care \u00ee\u0219i doresc ca jude\u021bul Boto\u0219ani s\u0103 aib\u0103 parte de dezvoltarea binemeritat\u0103<\/strong>\u201d, a mai subliniat Dorin Birta.<\/p>\n<\/blockquote>\n<p data-start=\"2676\" data-end=\"2866\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-medium wp-image-14518\" src=\"https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/cj_iftime_birta_bursuc_diac-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\" title=\"\"> <img decoding=\"async\" class=\"alignnone size-medium wp-image-14519\" src=\"https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii1-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" title=\"\" srcset=\"https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii1-300x169.jpg 300w, https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii1-1024x576.jpg 1024w, https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii1-768x432.jpg 768w, https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii1-1536x864.jpg 1536w, https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii1-150x84.jpg 150w, https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii1-450x253.jpg 450w, https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii1-1200x675.jpg 1200w, https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii1.jpg 1600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img decoding=\"async\" class=\"alignnone size-medium wp-image-14520\" src=\"https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii2-241x300.jpg\" alt=\"\" width=\"241\" height=\"300\" title=\"\" srcset=\"https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii2-241x300.jpg 241w, https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii2-150x187.jpg 150w, https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii2-450x560.jpg 450w, https:\/\/banulbotosanean.ro\/wp-content\/uploads\/2025\/06\/drumul-vamii2.jpg 720w\" sizes=\"(max-width: 241px) 100vw, 241px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Drumul V\u0103mii intr\u0103 \u00een modernizare: dou\u0103 tronsoane, peste 38 km reabilita\u021bi. Investi\u021bie strategic\u0103 pentru dezvoltarea jude\u021bului Boto\u0219ani Boto\u0219ani, 28 iunie 2025 \u2013 Consiliul Jude\u021bean Boto\u0219ani a f\u0103cut un pas decisiv \u00een direc\u021bia moderniz\u0103rii infrastructurii rutiere, prin semnarea contractelor de execu\u021bie lucr\u0103ri pentru dou\u0103 dintre cele trei loturi ale proiectului de reabilitare a Drumului V\u0103mii \u2013<\/p>\n","protected":false},"author":1,"featured_media":14518,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,7,4],"tags":[3224,3219,3222,3218,3220,3225,3217,3221,3223],"class_list":["post-14517","post","type-post","status-publish","format-standard","has-post-thumbnail","category-administratie","category-economic","category-stiri-botosani","tag-big-conf-botosani","tag-cotusca-radauti-prut","tag-dezvoltare-nord-est","tag-dj-282","tag-dorin-birta-consiliul-judetean","tag-drum-strategic-botosani","tag-drumul-vamii-botosani","tag-infrastructura-botosani","tag-program-regional-2021-2027"],"_links":{"self":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts\/14517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/comments?post=14517"}],"version-history":[{"count":2,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts\/14517\/revisions"}],"predecessor-version":[{"id":14522,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts\/14517\/revisions\/14522"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/media\/14518"}],"wp:attachment":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/media?parent=14517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/categories?post=14517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/tags?post=14517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}