{"id":10881,"date":"2025-01-25T13:59:30","date_gmt":"2025-01-25T11:59:30","guid":{"rendered":"https:\/\/banulbotosanean.ro\/?p=10881"},"modified":"2025-01-25T13:59:30","modified_gmt":"2025-01-25T11:59:30","slug":"de-interes-si-pentru-botosani-varianta-de-ocolire-podu-iloaiei-pe-autostrada-a8-intra-in-licitatie","status":"publish","type":"post","link":"https:\/\/banulbotosanean.ro\/index.php\/2025\/01\/25\/de-interes-si-pentru-botosani-varianta-de-ocolire-podu-iloaiei-pe-autostrada-a8-intra-in-licitatie\/","title":{"rendered":"De Interes \u0219i pentru Boto\u0219ani: Varianta de Ocolire Podu Iloaiei pe Autostrada A8 Intr\u0103 \u00een Licita\u021bie"},"content":{"rendered":"<p>Compania Na\u021bional\u0103 de Investi\u021bii Rutiere (CNIR) a \u00eenaintat, pe 24 ianuarie 2025, documenta\u021bia tehnic\u0103 pentru tronsonul 2 al autostr\u0103zii A8, care leag\u0103 T\u00e2rgu Frumos de Le\u021bcani, av\u00e2nd o lungime de aproximativ 29 km. Acest segment include o variant\u0103 de ocolire la nord de ora\u0219ul Podu Iloaiei, menit\u0103 s\u0103 fluidizeze traficul \u00een zon\u0103.<\/p>\n<p>Dup\u0103 validarea documenta\u021biei de c\u0103tre Agen\u021bia Na\u021bional\u0103 pentru Achizi\u021bii Publice (ANAP), anun\u021bul de licita\u021bie va fi publicat \u00een Sistemul Electronic de Achizi\u021bii Publice (SEAP), iar constructorii interesa\u021bi vor putea depune ofertele, cel mai probabil, \u00een luna aprilie. Licita\u021bia vizeaz\u0103 at\u00e2t proiectarea, c\u00e2t \u0219i execu\u021bia lucr\u0103rilor.<\/p>\n<p>Durata total\u0103 a proiectului este estimat\u0103 la 46 de luni, \u00eemp\u0103r\u021bit\u0103 \u00een 10 luni pentru proiectare \u0219i 36 de luni pentru execu\u021bie. Traseul propus prevede construc\u021bia a 19 poduri, inclusiv unul de 1.130 metri lungime, dou\u0103 tuneluri \u0219i dou\u0103 noduri rutiere la Podu Iloaiei \u0219i Le\u021bcani. De asemenea, vor fi amenajate un spa\u021biu de servicii de tip S3 pe ambele sensuri, dou\u0103 parc\u0103ri de scurt\u0103 durat\u0103 \u0219i un Centru de \u00centre\u021binere \u0219i Coordonare \u00een apropierea localit\u0103\u021bii Le\u021bcani.<\/p>\n<p>Pentru a \u00eencuraja finalizarea rapid\u0103 a variantei de ocolire a ora\u0219ului Podu Iloaiei, ofertan\u021bii care se angajeaz\u0103 s\u0103 finalizeze cei 4 km aferen\u021bi acestei sec\u021biuni \u00een termen de maximum 14 luni vor beneficia de punctaj suplimentar \u00een evaluarea ofertelor.<\/p>\n<p>Acest proiect face parte din eforturile continue de dezvoltare a infrastructurii rutiere din regiunea Moldovei, av\u00e2nd ca scop \u00eembun\u0103t\u0103\u021birea conectivit\u0103\u021bii \u0219i reducerea timpilor de deplasare pentru participan\u021bii la trafic.<\/p>\n<p>Sursa: <a class=\"ml-1 inline-flex h-[22px] items-center rounded-xl bg-[#f4f4f4] px-2 text-[0.5em] font-medium text-token-text-secondary dark:bg-token-main-surface-secondary relative top-[-0.094rem] !text-token-text-secondary uppercase hover:bg-token-text-primary hover:!text-token-main-surface-secondary dark:hover:bg-token-text-primary group\" href=\"https:\/\/apix.ro\/varianta-nord-de-ocolire-a-orasului-podu-iloaiei-in-regim-de-autostrada-intra-in-licitatie-de-executie\/?utm_source=chatgpt.com\" target=\"_blank\" rel=\"noopener\"><span class=\"truncate\">\u0218tirile Apix<\/span><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Compania Na\u021bional\u0103 de Investi\u021bii Rutiere (CNIR) a \u00eenaintat, pe 24 ianuarie 2025, documenta\u021bia tehnic\u0103 pentru tronsonul 2 al autostr\u0103zii A8, care leag\u0103 T\u00e2rgu Frumos de Le\u021bcani, av\u00e2nd o lungime de aproximativ 29 km. Acest segment include o variant\u0103 de ocolire la nord de ora\u0219ul Podu Iloaiei, menit\u0103 s\u0103 fluidizeze traficul \u00een zon\u0103. Dup\u0103 validarea documenta\u021biei<\/p>\n","protected":false},"author":1,"featured_media":10882,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7,2,4,11,9,12],"tags":[2014],"class_list":["post-10881","post","type-post","status-publish","format-standard","has-post-thumbnail","category-economic","category-editors-picks","category-stiri-botosani","category-stiri-locale","category-cele-mai-top-stiri","category-trending-news","tag-varianta-de-ocolire-podu-iloaiei-pe-autostrada-a8-intra-in-licitatie"],"_links":{"self":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts\/10881","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/comments?post=10881"}],"version-history":[{"count":2,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts\/10881\/revisions"}],"predecessor-version":[{"id":10884,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/posts\/10881\/revisions\/10884"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/media\/10882"}],"wp:attachment":[{"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/media?parent=10881"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/categories?post=10881"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/banulbotosanean.ro\/index.php\/wp-json\/wp\/v2\/tags?post=10881"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}